Home
/
Sell a commercial vehicle
/
Sell construction machinery
Excavator · Wheel loader · Dumper · Telehandler

Sell your construction machine: dealers bid, truckoo handles the transaction.

You list your construction machine with its registration document and photos. Verified dealers and exporters then submit binding bids, and you decide whether to accept one. The purchase contract, payment and collection run through truckoo – not through the dealer. For you the sale is free of charge, even after you accept.

1,500+ verified buyers
35+ countries
250+ partner workshops
Payment by instant bank transfer
Wheel loader – selling construction machinery through truckoo

The construction machines you sell through truckoo

Through truckoo you sell earthmoving and construction machinery in every size class: crawler and wheeled excavators, mini excavators, wheel loaders, compact loaders, dumpers, rollers, graders and telehandlers. Unlike road vehicles, what counts here are operating hours rather than kilometres.

  • Crawler excavators
  • Wheeled excavators
  • Mini excavators up to 6 tonnes
  • Wheel loaders
  • Compact and yard loaders
  • Dumpers and articulated dump trucks
  • Rollers and compactors
  • Graders and bulldozers
  • Telehandlers

Attachments belong in the listing. A quick coupler, a sorting grab or a second set of buckets lifts the bid noticeably – and if they are missing at handover, that costs more than they are worth.

  • Caterpillar
  • Liebherr
  • Komatsu
  • Volvo Construction Equipment
  • JCB
  • Hitachi
  • Wacker Neuson
  • Takeuchi
  • Kubota
  • Bobcat
  • Doosan and Develon

How the sale works

The sale consists of four steps: list, receive bids, accept a bid, hand over. Until you accept a bid you can cancel at any time at no cost – and even after that you pay nothing.

Step 1

List your vehicle

Photograph the registration certificate, enter the mileage, take six mandatory photos. The listing process guides you through each photo. Around ten minutes.

Step 2

Receive bids

Every bid is binding and valid for a fixed period. You see all bids side by side, not just the highest.

Step 3

Accept a bid

If none suits, you don’t sell – at no cost. Once accepted, there is no renegotiation.

Step 4

Handover and payment

Handover at a partner workshop or collection from your premises. Then payout by instant bank transfer. Deregistration can be added as an optional service (from 49 €).

Market value

What makes your construction machine valuable

Four factors determine the price: the operating hours, the condition of the undercarriage or the tyres, the brand together with its spare parts supply in the target market, and the range of attachments. On construction machinery, the year of manufacture says less than the hours on the counter.

Operating hours

For construction machines, operating hours are what the odometer is for a truck – only more meaningful. An eight-year-old excavator with 4,000 hours is worth more than a four-year-old one with 9,000. In addition, it counts how those hours were accumulated: demolition and recycling wear a machine out faster than earthmoving.

Undercarriage and tyres

On tracked machines the undercarriage is the most expensive wear item of all – tracks, rollers, idlers and track tensioners can account for a substantial share of the machine's value. A percentage figure for the remaining condition belongs in the vehicle details. On wheeled machines, the tyres and axles take on that role.

Make and spare parts supply

Caterpillar, Komatsu, Liebherr and Volvo are considerably easier to sell on the export markets than niche makes, because workshop networks and a supply of spare parts exist there. Among smaller machines, Wacker Neuson, Takeuchi and Kubota are among the sought-after makes. The premium for the make is more noticeable with construction machines than with road vehicles.

Attachments and additional equipment

A quick coupler, sets of buckets, a hammer, a sorting grab, air conditioning, central lubrication and weighing systems raise the bid. What matters is that they are listed in full and are actually there at the handover – an attachment found to be missing afterwards costs more in the processing than it was worth in the bid.

Why listing prices say little about construction machinery

Listing prices for construction machinery are dealers' selling prices and almost always contain negotiating room. Above all, though, they lack the detail that determines the value: the condition of the undercarriage and the range of attachments. Two excavators with the same hour count can differ considerably in value. Five items lie between the listing price and the purchase:

  • Transport to the dealer
  • Financing costs per day in stock
  • Smart repair and reconditioning
  • Dealer margin
  • Negotiating room

On transport the gap is larger than with road vehicles, because a construction machine is moved by low loader and does not drive itself. That is exactly why having several dealers calculate at the same time brings especially much here – the nearest one has the most room to move.

Even if the machine is not perfect

Condition rules out no machine. Excavators and loaders that are not operational also find buyers – dealers with their own workshop and exporters. Two details are decisive, and sellers often leave them out: the remaining condition of the undercarriage and whether the machine can still be loaded under its own power.

High operating hours

Ten thousand hours is no bar for a tracked excavator. What matters are the service records and the condition of the hydraulics and the undercarriage. A documented engine or pump overhaul is an argument for a higher price.

Hydraulic or engine damage

Machines that are not operational also find buyers – dealers with their own workshop and exporters. State the damage as precisely as possible, including whether the machine can still be loaded.

Worn undercarriage

Tracks, rollers and idlers are the most expensive wear item on a tracked machine. A remaining condition given as a percentage belongs in the vehicle details – otherwise dealers estimate it conservatively, and that costs more than an honest figure.

Without attachments or with third-party attachments

A machine without a bucket or a quick coupler is saleable, but fetches less. List exactly what is included and what is not – attachments found to be missing afterwards are the most common point of dispute at the handover.

Rollover or accident damage

Rollover and accident damage does not rule out a sale, but often affects load-bearing parts. Enclose an expert report or repair records so that dealers do not devalue the frame across the board.

Leased or financed machine

An ongoing contract does not stand in the way of a sale. truckoo obtains the settlement amount from the bank or the leasing company and offsets it against the purchase price – you receive the difference.

Who bids on your construction machine

On truckoo, 1500+ verified dealers and exporters from 35+ countries submit bids. Every buyer is checked for proof of trade registration, VAT identification number and solvency before being approved. You yourself have a contract with none of them – your contractual partner is truckoo.

The difference from a classified ad is the number of calculations. With construction machinery that weighs heavily, because low-loader transport makes up a considerable part of the calculation: the nearest dealer has the most room to move. Through truckoo, regional and international buyers bid side by side, and you see where the difference lies.

What is checked before activation
Business registration and commercial register extract
VAT identification number
Payment history from completed purchases
Acceptance rate after a bid has been submitted

Frequently asked questions about selling construction machinery

What does it cost to sell a construction machine?

For sellers, selling through truckoo is free of charge – completely and permanently. There is no listing fee, no brokerage commission and no deduction from the purchase price, not even when you accept a bid and actually sell.

How long does it take until the first bid?

As a rule, a few working days after the vehicle details are complete. Photograph not only the machine itself but also the hour meter, the undercarriage or the tyres and all attachments – without these three shots, dealers calculate cautiously.

Do I have to accept a bid?

No. You see every bid and decide freely. If you accept none, no costs arise and the vehicle stays yours. There is no deadline by which you have to decide – only the individual bids are time-limited.

Who is my contractual partner in the sale?

truckoo. The sales contract, the payment and the processing all run through truckoo, not through the dealer who bids. You have a single point of contact, even if something needs clarifying after the handover.

When do I get my money?

On the day of handover. As soon as the partner on site has confirmed that the vehicle, keys and documents have been handed over in full, truckoo pays out by instant bank transfer. You do not have to chase your money and you do not have to pay anything in advance.

How are operating hours valued?

With construction machines, operating hours are the single most important value – more important than the year of manufacture. In addition, it counts how those hours were accumulated: demolition and recycling wear a machine out faster than earthmoving. State the meter reading and the field of use, and the bid becomes more reliable.

What documents do I need?

Unlike road vehicles, there is usually no registration certificate. What matters are the purchase receipt or proof of ownership, the CE marking and declaration of conformity, the operating manual, service records and – if available – the most recent statutory safety inspection report (DGUV). For mobile excavators that require road registration, the vehicle papers are needed as well.

Who arranges the transport?

The buyer. Construction machines are collected by low-loader; the cost of that is accounted for in the bid. When entering the vehicle details, state whether the machine can be loaded under its own power and whether the access is suitable for a low-loader.

List your construction machine and receive bids

Ten minutes to create the listing, then you decide at your own pace. For sellers the sale is free of charge – even when you do sell.

List construction machine